Days to go : 283
With Christmas nearly here, there hasn't been a lot of progress.
Norfolk & Suffolk 4X4 Response was on standby all through the weekend on behalf of the East Anglian Ambulance Trust, because of the snow. As a result, and because the fuel tanks are now behaving themselves, I refitted all my kit back in the boot (taking a few pictures and adding an article of course) so that I was ready if required.
The other day I did remove the mesh floor and hi-lift bracket from the roofrack in preparation for modifications to take the roof tent.
The last couple of days I have been 'fettling' with the website to finally get it the way I like it. There are still a few more tweaks I would like too add but I need to find suitable modules first.
