Update on progress

Written by ralph on 23/12/2009. Posted in Ralph's blog

Days to go : 283

With Christmas nearly here, there hasn’t been a lot of progress.

Norfolk & Suffolk 4X4 Response was on standby all through the weekend on behalf of the East Anglian Ambulance Trust, because of the snow.  As a result, and because the fuel tanks are now behaving themselves, I refitted all my kit back in the boot (taking a few pictures and adding an article of course) so that I was ready if required.

The other day I did remove the mesh floor and hi-lift bracket from the roofrack in preparation for modifications to take the roof tent.

The last couple of days I have been ‘fettling’ with the website to finally get it the way I like it.  There are still a few more tweaks I would like too add but I need to find suitable modules first.

 

Leave a Reply

Comments

comments

Trackback from your site.